Skip to content
Redwood Summit Rotorua · NZ
Follow the Build

Watch your stay
take shape.

Not a construction log. Each update is a piece of the stay you'll have — the approach through the trees, the outlook from the living spaces, the room where the ride ends. We'll keep adding to this page all the way to opening in 2027.

Site Diary

Where things stand.

Currently on site: the sealed access road and both lodge platforms, cut and shaped into the forest with erosion control on the batters, ahead of building work.

Freshly sealed access road curving toward the redwood tree line, with an excavator forming a lot platform in the distance On site · July 2026
July 2026

The last two minutes of the drive home

The sealed access road now runs up through the trees to the lodge platforms — the approach you’ll take at the end of every day out.

Aerial view of the access road and hydroseeded lot platforms cut into the hillside, with the state highway and forest beyond On site · July 2026
July 2026

Where the two lodges will sit

Both lodge platforms are cut and shaped along the access road, forest on one side and the valley opening out on the other. Hydroseeding holds the batters while planting establishes.

A grader parked on a newly formed lot platform overlooking misty forested hills On site · July 2026
July 2026

The outlook from the living spaces

Standing on a finished platform, looking the way the forest-facing rooms will look — misted hills and redwoods, no other buildings in view.

Build Stories

The milestones, in full.

Longer reads on the moments that shape the stay — what changed on site, and why a future guest should care.

The Reveals

Redwood Summit, one piece at a time.

A finished property can't do this. We're revealing Redwood Summit as it's built — and the First Stay List sees each reveal first.

Get First Access
  1. ✓ The location Revealed
  2. ✓ The forest outlook Revealed
  3. 03 The architectural form
  4. 04 The bike facilities
  5. 05 The outdoor area
  6. 06 The spa
  7. 07 Interior design
  8. 08 Finished bedrooms
  9. 09 The first ride from the door
  10. 10 The finished lodges
The First Stay List

Be first to stay.

Redwood Summit opens in 2027. Join the First Stay List for priority booking access, selected opening updates and an exclusive opening benefit.

Two lodges. Opening reservations will be released to the list before public booking.

Get First Access

No spam. We'll get in touch when there's something worth sharing.

The First Stay List

Be first to stay

Priority booking access when reservations open for 2027, selected opening updates and an exclusive opening benefit. No spam.

What brings you to Rotorua?